Home›Solutions›Factory Power Solutions
KEEP PRODUCTION MOVING

Factory Power Solutions

Power systems for manufacturing lines, process equipment and facility services — balancing continuity, load quality and practical maintenance.

APPLICATION OVERVIEW

Power planned around your factory.

Power systems for manufacturing lines, process equipment and facility services — balancing continuity, load quality and practical maintenance.

Zhiyutone helps match generation, distribution and supporting equipment to the project brief. Final performance and compliance are established through the agreed engineering design and equipment schedule.

Factory application
DESIGN PRIORITIES

What the power system needs to address

01

Production continuity

Prioritise loads that protect product, process safety and restart time during a mains outage.

02

Motor starting and transients

Model large motors, welding loads, variable-speed drives and rapid load changes before sizing equipment.

03

Distribution flexibility

Consider busway routes and tap-off positions for changing production layouts and future expansion.

04

Whole-life planning

Evaluate operating hours, fuel use, service access and maintenance scheduling alongside initial equipment cost.

PROPOSED SYSTEM SCOPE

From equipment to coordinated operation

  • Diesel standby or prime generation according to the operating duty.
  • Gas generation considered where the fuel supply and operating economics suit the project.
  • Busway and transformers aligned with production zones and future load additions.
  • Load-shedding and automatic transfer strategies agreed with the plant operator.
START YOUR ENQUIRY

Project information to prepare

Production load list; largest motor; drive and harmonic loads; shift pattern; outage history; future expansion; installation layout.

Questions before selection

Can the equipment be configured for our site?

Voltage, frequency, enclosure, controls and supporting equipment are reviewed against the project brief. Availability and the final bill of materials are confirmed in the quotation.

How is generator capacity selected?

The selection considers running load, starting loads, operating duty, redundancy and site derating. A nameplate total alone is not a complete sizing study.

What documentation should be agreed?

Confirm the technical schedule, drawings, test scope, operating manuals, destination compliance requirements and service responsibilities before placing an order.

Plan your factory power system.

Production load list; largest motor; drive and harmonic loads; shift pattern; outage history; future expansion; installation layout.

Request a quote →

Search Zhiyutone

Search published product and page titles. Need a specific configuration? Contact our team.