CONTINUITY FOR CRITICAL IT

Data Center Power Solutions

Backup power for server halls, cooling equipment and essential infrastructure — designed around the facility’s redundancy strategy and electrical architecture.

APPLICATION OVERVIEW

Power planned around your data center.

Backup power for server halls, cooling equipment and essential infrastructure — designed around the facility’s redundancy strategy and electrical architecture.

Zhiyutone helps match generation, distribution and supporting equipment to the project brief. Final performance and compliance are established through the agreed engineering design and equipment schedule.

Data Center application
DESIGN PRIORITIES

What the power system needs to address

01

Continuity without a single dependency

Separate critical loads, define the resilience target and coordinate generators with UPS autonomy and transfer equipment.

02

Stable power during load steps

Review UPS input characteristics, cooling starts, harmonic loads and allowable voltage and frequency excursions.

03

Space, noise and heat

Plan container or acoustic enclosures, service clearances, ventilation, exhaust and fuel storage for the site.

04

Visibility and maintainability

Align controller communications, alarms, remote monitoring, test schedules and maintenance access with facility operations.

PROPOSED SYSTEM SCOPE

From equipment to coordinated operation

  • Diesel generators arranged for the project’s N, N+1 or other specified redundancy target.
  • Synchronising and load-sharing controls with defined start, transfer and restoration sequences.
  • Busway and transformers coordinated with switchgear ratings and protection selectivity.
  • Commissioning plan covering staged load tests, alarm checks and operating procedures.
START YOUR ENQUIRY

Project information to prepare

IT and cooling load schedule; UPS topology; one-line diagram; redundancy objective; permitted noise level; fuel autonomy; BMS/DCIM interface.

Questions before selection

Can the equipment be configured for our site?

Voltage, frequency, enclosure, controls and supporting equipment are reviewed against the project brief. Availability and the final bill of materials are confirmed in the quotation.

How is generator capacity selected?

The selection considers running load, starting loads, operating duty, redundancy and site derating. A nameplate total alone is not a complete sizing study.

What documentation should be agreed?

Confirm the technical schedule, drawings, test scope, operating manuals, destination compliance requirements and service responsibilities before placing an order.

Plan your data center power system.

IT and cooling load schedule; UPS topology; one-line diagram; redundancy objective; permitted noise level; fuel autonomy; BMS/DCIM interface.

Request a quote →